Deliveries

First load of new stuff has been delivered.

It’s from IKEA, so needs to be assembled. F will assemble it and then get the carpenter to fix things to the wall. He also bought the iron strips/bars which will mean everything is off the floor (easier to clean, don’t you see?)

He will be working nearly all of this weekend but I suspect that, from Sunday, I shall hardly see him whilst he puts everything together and then puts all his stuff away.

Then, probably, he’ll start taking my stuff (CDs, DVDs, etc.) and putting those away. And I shan’t be able to stop him.

And, then, maybe, he’ll be happy. Not that he’s unhappy now – just that he’ll be really, really happy when this has been done.

Tomorrow, his wardrobe comes (and they’ll also assemble it), so all his clothes can go away.

The kitchen is another thing. The gas pipe needs an extension and the gas boiler must be connected. But, first we need a certificate from the people who installed it. But he’s handling that.

The three-piece suite is being picked up on Monday to have the recovering done.

in any case, by the end of July, we’ll be in. Maybe without gas and a fully functioning kitchen – but in anyway.

Apparently, it will all be perfect before we go away on holiday! He says.

He thinks!

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

This site uses Akismet to reduce spam. Learn how your comment data is processed.